A new house in Sammamish, from bare framing
On the new construction job in the video, we put in the whole heating and cooling system from scratch: ductwork, equipment and every connection, while the framing was still open.
Working before the walls close lets the ducts and lines run straight through the studs, with nothing to cut or patch later.
Rooms the ducts do not reach got Midea ceiling cassettes instead, mounted between the joists while the ceiling was still open, as the two longer videos show. The Carrier heat pump in the photos is a separate Sammamish job, at an existing home.








